| by Tom Gibson
|
The
Robert C. Byrd Green Bank Telescope looks a bit out of place in the rugged
West Virginia mountains. At 485 feet tall, the mammoth 16-million-pound
structure stands higher than the Statue of Liberty and ranks as one of
the world's largest radio telescopes.
But the astronomers who work at the observatory in Green Bank, W.Va.,
aren't so much impressed by the telescope's size as by its
accuracy, the result of careful and creative engineering. They've
waited for it since the project began in 1989, and they're just
now starting to use it on a regular basis.
 |
| The Green Bank, W.Va., radio telescope
has two acres of surface area made of 2,004 adjustable panels for
precise focus. |
In its short life, the telescope has already advanced the knowledge of
astronomy with some key discoveries. It assisted in observing the first
known double-pulsar binary systems, improving astronomers' understanding
of pulsarsradio-wave-emitting stars with strong magnetic fieldsand
allowing the most precise test yet of general relativity. It also detected
high-velocity neutral hydrogen clouds surrounding the Andromeda galaxy;
astronomers think the clouds might be long-sought-after galactic building
blocks.
Green Bank is one of several sites operated around the Western Hemisphere
that constitute the National Radio Astronomy Observatory. The facility
is operated for the National Science Foundation by Associated Universities
Inc., a nonprofit corporation formed by nine northeastern universities.
Other observatories are in Socorro, N.M.; Tucson, Ariz., and Santiago,
Chile.
Many objects in the universe emit radio waves, which can be detected from
distances beyond the range of optical telescopes. Radio telescopes allow
scientists to determine the makeup and age of celestial matter. Radio
astronomy has resulted in many spinoff technologies used in areas ranging
from the study of earthquakes to the early detection of breast cancer.
Like a Satellite TV Dish
Because of its size and accuracy, the new telescope will help researchers
peer deeper into the heavens than ever and further advance theories on
the origins of the universe. In particular, the device can detect gases
at higher frequencies than was previously possible, meaning astronomers
can explore carbon monoxide, which has the highest frequency in the gas
spectrum. The substance abounds in the Milky Way, often in regions where
new stars are made.
A radio telescope is a parabolic surface reflector antenna that works
much like a TV satellite dish. Incident radio-frequency waves bounce off
the dish to a subreflector placed at the focal point of the parabola.
The subreflector directs waves to a feed horn at the center of the dish,
where they're converted to electric current. The signal enters
an amplifier and then a computer, which records it on magnetic tape or
displays the information as an image on a screen. Waves of different intensities
are given different colors to create a photograph-like depiction, so astronomers
can plot images of stars, galaxies, pulsars, quasars, and supernovas,
and piece together the evolution of the universe.
Planning for the Green Bank Telescope began in 1988 after the much-used
300-foot radio telescope at the observatory collapsed from fatigue. "The
overall design was in the back of people's minds at the time, and
once that happened, it provided the impetus to bring the new idea on line,"
said Mark McKinnon, an assistant scientist at Green Bank throughout most
of the project. The observatory received funding from Congress for the
$75 million project in 1989.
Lee King, a now-retired engineer who worked out of the observatory's
headquarters in Charlottesville, Va., had designed numerous telescopes
for the observatory's various sites, and served as chief engineer
for the Green Bank telescope. Scientists and engineers at Charlottesville
did preliminary design work with help from the Jet Propulsion Laboratory
in Pasadena, Calif.
According to McKinnon, "When radio astronomers build a new instrument,
they don't settle for the status quo." The Green Bank telescope
would sport a host of new design features. For starters, the structure's
steel members would have welded joints rather than the bolted connections
used in the past.
Dave Seaman, who was a mechanical engineer on the project, said that welding
stiffens the structure "because you have infinitesimal amounts
of slippage at bolt joints, and these can add up."
The telescope would have an offset feed arm, meaning the subreflector
at the focal point would lie outside the path of incident radio waves,
increasing the viewing area by as much as 10 percent. This is accomplished
by having the dish consist of a shallow section of a parabola to one side
of its centerline rather than symmetrical about it.
Measuring 100 by 110 meters, the telescope's oval reflector dish
has two acres of surface area. The surface would consist of 2,004 panels
that could be adjusted in and out to fine-tune the shape of the surface.
"The idea is to keep the telescope in focus all the time,"
McKinnon said. "That becomes very important at high-frequency observations,
where the telescope will have its biggest impact." The active surface
minimizes distortions caused by structural deflection from temperature
change, irregular loading such as snow, and the variation in gravitational
forces at different tilt angles. Mechanisms for manipulating the surface
shape actually come from previous radio telescopes, but at Green Bank
they are used on a larger scale and in more precise ways with extensive
electronic control.
The observatory awarded a contract to Radiation Systems Inc., an antenna
specialist in Sterling, Va., for the design, construction, and testing
of the telescope. Radiation Systems chose Loral, a company in San Jose,
Calif., to perform engineering work, and Electro Space Industries, a division
of Radiation Systems, to design the control systems.
The observatory at Green Bank hired Seaman, plus a project manager and
a structural engineer, for the telescope project. Working with engineers
at Loral, they had a year and a half to come up with a detailed design
before construction began in July 1991. The engineers hired by the observatory
stayed through most of the project; the structural engineer retired in
2003, the project manager left after the project was finished, and Seaman
left in 1998.
Much of the observatory engineers' effort focused on stress analysis
to ensure structural integrity of Loral's design. Seaman recalled,
"We actually ran more than 95 computer modelsdifferent
design configurations. Each one of those models had about 80 different
load cases for various loads of wind, ice, and snow." They also
tested models in a wind tunnel to determine the structure's aerodynamic
characteristics.
Construction began with excavation 20 feet deep to a hard layer of shale
and the pouring of 4,000 cubic yards of concrete for a foundation. With
this in place, workers installed the azimuth track and the pintle bearing,
a 12-foot-diameter ball bearing around which the entire structure pivots.
Sixteen 52-inch-diameter wheels rotate the structure as they travel around
a circular steel track that's 210 feet in diameter. To ensure precise
rotation, the track was grouted in place by hand and leveled to within
0.003 inch with a water level that uses motor-driven micrometers.
 |
| Azimuth wheels that rotate the
Green Bank Telescope each have two 30-hp motors. |
The basic structure of the telescope consists of the rotating lower section,
known as the alidade, and the tipping structure, which tilts within it.
The latter contains the dish and reflector arm, and pivots about a shaft
made from a 36-inch pipe turning in one-meter roller bearings. Over two
million pounds of counterweight on the tipping structure balance the load,
making it easier to tilt.
Radiation Systems fabricated the alidade at its plant in Mexia, Texas,
and then measured it in the summer heat. The company disassembled the
alidade for shipment and later reassembled it in the cold of a West Virginia
winter. The distance between the two towers of the alidade that support
the tipping structure decreased by an inch and a half from initial measurements
because of thermal contraction. But the engineers predicted this through
calculations and ensured the correct final dimension by preloading the
towers, actually pulling them toward each other.
Direct current electric motors drive both the rotation and tilting functions
in conjunction with an elaborate servo control system. This allows operators
to accelerate and decelerate the antenna smoothly, and to make fine adjustments.
Eight azimuth wheels each have two 30-horsepower motors, while the elevation
drive uses eight 40-hp motors. Each motor has a gear reduction box, a
tachometer, and a failsafe electric brake on its tailshaft. Each azimuth
drive wheel has two pinions driving its bull gear to apply a counter torque;
one rotates in the reverse direction, removing backlash from the gears.
Receiving signals from a myriad of sensors, the computer-controlled servo
system applies power and brakes as needed.
The aluminum surface panels of the dish's active surface measure 2x2 1/2
meters each and adjust by means of custom-designed linear ball screw actuators
placed at the intersections of the plates' corners. A computerized system
of lasers bounces beams off mirrors and reflectors to constantly check
the surface, determine its optimum position, and send signals to the actuators.
Technicians can also input data from finite element modeling and thermal
analysis to further optimize the shape. The dish surface has 2,209 electric
actuators for individual plates, each powered by a dc motor and controlled
by a dedicated programmable logic controller.
With construction complete, the telescope saw first light on Aug. 22,
2000, when a team led by Mark McKinnon used it to track a galaxy across
the sky, and it began regular scientific observations on a limited basis
in early 2001. Astronomers and engineers emphasize that its performance
will evolve and improve with time as they break in different configurations
of equipment on it.
Dennis Egan, head of the mechanical engineering division at the observatory
in Green Bank, said, "We're doing a lot of commissioning,
but we're also doing a lot of science now. We've got quite
a few receivers that are up, and it is an operating telescope."
Richard Prestage, deputy site director at Green Bank, said, "The
mechanical structure of the telescope itself is exceeding the expectations
from the design phase. The pointing performance is better than we had
hoped. The surface is better than the spec the contractors were required
to deliver."
The telescope operates over a greater band of wavelengths than any telescope
before it and also points with greater accuracy. It can zero in on targets
within an arcsecond, the angle subtended by a dime from a mile away.
Because of its size and complexities, many people wondered how the finished
product would perform. According to Egan, "It's a wonderful
structure, behaving very much as predicted. It's a real poster
child for numerical analysis."
Tom Gibson, based in Lewisburg, Pa., is a freelance
writer specializing in technology and engineering.
home
| features | breaking
news | marketplace
| departments | about
ME back issues | ASME
| site search
© 2004 by The American Society
of Mechanical Engineers
|